> Construction > West System Interchange

West system Interchange

West System Interchange

Project Location

Council Bluffs, IA

Project Description

Reconstruction of the West System Interchange will provide for efficient and safe vehicle movement on both I-29 and I-80 systems. The left-hand entrance and exit from I-29 to I-80 will be eliminated as part of the reconstruction. An increase in the number of travel lanes for both I-80 and I-29 will allow motorists to reduce the number of lane changes needed between I-80 and I-29.

The project includes full reconstruction of this system to system interchange, providing full access from I-80 and I-29 to the I-80 express lanes and the I-29/I-80 local lanes in the dual, divided freeway.

The West System Interchange reconstruction projects are located approximately one-half mile east of the Missouri River where I-80 intersects I-29 near the Western Historic Trails Center in Council Bluffs.

 

Project Schedule

Phase Ia Construction: 07/2009 — 11/2014
Phase Ib Construction: 06/2012 — 11/2014
Phase II Construction: 06/2015 — 07/2017

PROJECT FACTSHEET
Project Map
Project Map
Current Conditions (Oct 2017)
Current Conditions (Oct 2017)

Project Gallery

[Click each thumbnail for larger image]

Project references

Project Name: West System Interchange
Project Number(s): Bridge IM-NHS-029-3(80)52--03-78; Bridge IM-NHS 029-3(81)52--03-78; Grade IM-NHS-029-3(86)52--03-78; Grade IM-NHS-029-3(87)52--03-78; Grade IM-NHS-80-1(392)0--03-78

Additional Resources

 Trail Closure Information

Other Construction

Not the project you were looking for? Use the links below to return to the design overview map, other construction pages or the program photo gallery.
Design Overview
Future Construction
Photo Gallery